Who signed in / out each day, location & signatures.
View completed / in-progress records. Fill opens the input form (QR for subcontractors where relevant).
Pick a tab for the form family you need. Directors: Open on a register for scored HTML / KPI cards, or Projects Hub → Operations Control for the portfolio exception view. After editing CSVs in Site Documents → Operations → csv (including Operatives names), use Refresh name lists so attendance / diary pickers update.
Who signed in / out each day, location & signatures.
Daily site records — one diary per PM per day.
Daily site photo library — upload, tag by block / level / trade, and add a description. Not a form.
Morning briefing (QFL-IMS-HSF-021) — prestart checks, work tasks per subcontractor, QR sign-on.
Before work begins (QFL-IMS-HSF-014a) — 16 standard checks, prefilled, add or remove to suit the day.
End of shift (QFL-IMS-HSF-014b) — 13 standard checks for leaving the area safe and secure.
Accept MC handover areas — sign & issue PDF (QFL-IMS-QF-001).
Reject an area as not ready — sign & issue PDF (QFL-IMS-QF-002).
Hand over completed works — markup, photos, MC counter-sign (QFL-IMS-QF-003).
Company-wide checklist template — edit tables once, use on every project (QFL-QA-TEMPLATE).
Gateway Corofil COSB25, CCFS & Nyrock — evidence photos per requirement (QFL-IMS-QF-007).
Gateway horizontal & vertical aluminium support — evidence photos per requirement (QFL-IMS-QF-009).
Parliament Place OBEX EPDM & window perimeter — evidence photos per requirement (QFL-096-EPDM).
Parliament Place Rockwool/Supalux & RCM Y-Wall — evidence photos per requirement (QFL-096-PROMAT-YWALL).
Parliament Place Tyvek membrane — evidence photos per requirement (QFL-096-TYVEK).
Company Word masters — amend in Word per project, upload PDF/Word to the project library.
Online MS form: scope/sequence, personnel, RA multi-select, hospital map & elevation images. Sign stamps attached RAs.
Set project cover fields; stamp Word masters on MS issue (or upload override). Attach on Method Statements.
Event report + staged close-out (QFL-IMS-HSF-NEAR) — drives weekly H&S follow-up open/closed.
Mastclimber daily usage check (QFL-IMS-HSF-029). Operative must be MCWP Trained = Yes on the Operatives names CSV. Sign on the pad on the form.
MEWP daily usage check (QFL-IMS-HSF-020). Operative IPAF Number must start with OP. Public QR form — sign on the pad.
Scaffold inspection register (QFL-IMS-HSF-007). Operative must be PASMA = Yes on the Operatives names CSV. Yes / No / N/A checks. Sign on the pad.